Write an eight to ten (8-10) Risk Workshop and Risk Register
Component paper in which you: 1.Identify the required pre-workshop
activities. 2.Prepare a risk workshop agenda based on Figure B-8,
Sample Agenda for a First Risk Assessment / Two – Day Risk
Workshop (Appendix B of the Hillson and Simon text). Include
suggested time intervals for each activity and justify why each
agenda item is relevant for this case. 3.Determine the top five (5)
threats in a risk register following Figure B-11, Sample Simplified
Risk Register Format (Appendix B of the Hillson and Simon text).
Include information from the case for each threat. 4.Justify the
assignment of probability and impacts for each threat identified in
criterion number 3 of this assignment. 5.Document the top three (3)
opportunities in a risk register following Figure B-11, Sample
Simplified Risk Register Format (Appendix B of the Hillson and
Simon text). Include information from the case for each
opportunity. 6.Justify the assignment of probability and impacts
for each opportunity identified in criterion number 5 of this
assignment. 7.Use at least two (2) quality resources in this
assignment. Note: Wikipedia and similar Websites do not qualify as
quality resources.
Your assignment must follow these formatting requirements: •Be
typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides. •Include a cover page containing the
title of the assignment, the student’s name, the professor’s
name, the course title, and the date. The cover page and the
reference page are not included in the required assignment page
length.
The specific course learning outcomes associated with this
assignment are: •Assess and prioritize risks to the project through
an analysis of the active threats and opportunities presented.
•Apply the Active Threats and Opportunities Management (ATOM)
process to ensure a consistent, measurable result of this analysis.
•Use technology and information resources to research issues in
project risk management •Write clearly and concisely about project
risk management using proper writing mechanics